STRONG CURRENT / WEAK CURRENT
Power grid review meetings
Network plans and reservations
Incorporations
Plan of the excavation floor and grounding
Influence zoning
- Strong Current/Low Voltage Studies: Delimitation of the distribution of supply circuits, from each electrical cabinet for all areas of the building.
- Weak Current/IT Telecommunication Studies: Delimitation of the influx of VDI bays in all areas of the building.
- Fire Alarm System: Delimitation of areas protected by the fire panel.
Power balance
3d modelling of the technical installations
Calculation notes
Terminal installation plans
Electrical diagrams
Synoptics
- Strong Current/Low Voltage Studies: Single-wire document representing the entire electrical installation: HV, LV, ground network, counting and control principle.
- Weak Current/ Fire Alarm System: Single-wire document representing the entire installation: Access Control, Video surveillance, VDI, Intercom.
Functional analysis
- Functional analysis of lighting, the site and the Fire Alarm System: - Describes the operation of the power supply, the lighting controls, as well as fire and smoke detection, at each point in the building.